Water Supply Sources and Water Treatment Alternatives in Ecuador
Diagnostic and Prefeasibility Study of Drinking Water Supply Systems for the City of Manta
Countries: Argentina, Brazil, Peru, Colombia, Costa Rica, Cuba
Services: Hydraulics (drinking water)
Client/Financeur : Agence Française de Développement
Duration: February 2023 to June 2024
Total amount: €99,985
Project Description
Conducting a comprehensive technical and institutional study for a 40-year design period, including the assessment of new treatment solutions, the adaptation of existing systems and the integration of climate risks. The study covered the analysis of various scenarios, the selection of viable options, and the preparation of terms of reference for the construction of a desalination plant and the improvement of existing infrastructure.
Our Services
Phase I: Diagnostic and Proposal of Alternatives
- Review and analysis of existing information.
- Diagnosis of the current situation in the project area.
- Demographic study of the project’s area of influence.
- Supply projection scenarios in relation to future demand (6 scenarios).
- Approach and consensual definition with the beneficiary of 12 alternatives, comparative analysis and selection of the 3 alternatives to be developed in Phase II.
Phase II: Prefeasibility
- Adjustment of supply in relation to projected demand – Definition of design stages and flow rates.
- Basic engineering design of the 3 selected supply alternatives (for a flow increase between 250 and 500 l/s).
- Updating of the hydraulic model according to the basic engineering designs.
- Risk management and vulnerability assessment of the system (to climate change, institutional and natural risks).
- Reference budgets for investment, operation and maintenance.
- Economic and financial evaluation and sensitivity analysis of the alternatives.
- Comparison of alternatives through a multi-criteria analysis and selection of the most viable alternative.
Phase III: Preparation of Terms of Reference (ToR) and Economic Model
- Preparation of the ToR for the selected alternative and complementary studies. The selected alternative (500 l/s increase) includes: Implementation of a desalination plant west of the city of Manta (250 l/s) and optimization of infrastructure (250 l/s increase).
- Preparation of the reference budget for the consultancy.
- Development of the economic model.